以下是网站 nzrgeo.com 在 2011-01 的历史页面存档,小提示:CTRL+U 查看源码
本站和 nzrgeo.com 的作者无关,不对其内容负责。本历史页面谨为网络历史索引,不代表被查询网站的即时页面。 *号[x]表示已屏蔽显示的敏感字。
原网页标题:NZR GEOLOGIC, INC. Environmental Site Assessments, Phase I, Phase II Geologist Consultant Hazardous Waste Contamination Remediation of Soil and Groundwater

Mr. Barry Bowman, MS, President

P.O. Box 92

Bronx, NY 10460-9998

Phone: 917-497-6517

Fax: 801-454-7108

Email: barry.b@nzrgeo.com

To contact us:

Environmental Services

 

ESA Phase I/II of residential or commercial buildings, and vacant land.

 

Usually a two-week turn around.

 

Underground Storage Tank (UST) and Above Ground Storage Tank Removal (AST).

 

Soil and groundwater sampling for chemical contamination.

 

Monitoring well installation.

Leaking Underground Storage Tank Removal (LUST). When a LUST is removed contaminated soil must be removed and the remaining soil sampled and tested to insure the remediation is complete. A Geologist should be on hand to insure the soil clean-up is to the specifications of the New York State Department of Environmental Conservation guidelines.

NZR GEOLOGIC, INC. Environmental Site Assessments, Phase I, Phase II Geologist Consultant Hazardous Waste Contamination Remediation of Soil and Groundwater